The next step is to pull the appropriate permits from the local department of building and safety so work can commence as planned. Once the permits are pulled, demolition can start. Whether every component of your home needs to be replaced for a complete renovation, or if a partial remodel is what you are looking for, our team is here to do the job as quickly and thoroughly as possible. If a second story is to be added, or if certain walls are to be removed, we may need to create the necessary space by implementing framing work. At times, framing work may include structural components which require architectural plans and foundation work. While this is not always the case, houses that do require structural work tend to be more expensive, take longer to build, and are more labor intensive, as the work requires a higher level of detail.